Trodeon LLC

How it works · the evidence-led uptime platform

Review the signal before the pilot decision — not after the truck stops.

Four illustrative stages — available telemetry is reviewed inside the written pilot scope, candidate signals surface for operator review, and any service coordination is checked separately against declared coverage.

Plug-insignal reviewAlertDispatch

Signal review lead across the in-service fleet

To be measured

Median · rolling 6-week fleet average

Evidence state

I review your telematics data for signals across DPF and aftertreatment, turbo, electrical, and fuel delivery. Every flag comes with the evidence behind it and a physical validation step. When the data isn't there to say something useful, I say so.

Public examples are scoped evidence reviews, not detection or outcome guarantees. The next step is a physical validation check inside the written pilot scope.

No public family capability is currently eligible for presentation.

More than a diagnostic scanner

Six jobs the platform does that a code reader cannot.

Every row carries a proof-led sentence. Synthetic and pilot-validation states stay labeled; no guaranteed prevention is implied.

01

Reviews a signal developing over time

Per-part wear signals are scored against a rolling 14-day baseline — the model flags drift, not a single-frame snapshot read.

02

States the evidence and operating context

Every finding names the contributing bus signals and the duty-cycle / load / ambient conditions in play at the moment it was scored.

03

Weighs competing causes, not a single DTC answer

Ranked evidence review over the active hypothesis set — a thermistor fault and a sticky VGT both surface near the top when the J1939 stream shows either is plausible.

04

Recommends the least-invasive validation step

Trodeon prefers a cab-side CAN read or a bench quick-test before any teardown.

05

Expresses calibrated evidence and uncertainty

Evidence review percentage and a window of review timing — no lone-precision claims, no “always” / “never” language.

06

Connects the validated fix to repair timing and avoided downtime

Once the cheap read confirms the cause, the platform reserves the install slot, stages the part, and posts an avoided-downtime range against your loaded hourly cost.

The walkthrough

The four stages, as the operator would see them.

Each card below is an illustrative interface state — synthetic telemetry rows, a candidate window, an evidence review, and a scope-dependent coordination step. It is not a live-fleet result or a guarantee.

01 · Stage 01 · Connect

Start with the data path your written pilot scope allows.

The current pilot path evaluates existing J1939 or compatible telematics data when the fleet can provide the required access.

Illustrative review state

Evidence window pending physical validation.

02 · Stage 02 · Compare

The workflow compares signal drift without calling a candidate a certainty.

The prototype scores an incoming stream against a rig's baseline and surfaces a candidate window for review.

Illustrative review state

Evidence window pending physical validation.

03 · Stage 03 · Review

A candidate lands in the workbench with evidence and open questions in view.

The operator reviews the rig context, candidate signal, evidence gaps, and next physical validation step.

Illustrative review state

Evidence window pending physical validation.

04 · Stage 04 · Coordinate

Service coordination is scope-dependent and never guaranteed by the signal alone.

If the written pilot scope includes service coordination, Trodeon can review declared coverage and the agreed job scope.

Illustrative review state

Evidence window pending physical validation.

Synthetic demo data

Watch the VGT drift develop across 14 days — not a snapshot.

Today · +6.6% drift · high

Evidence review

Evidence review over the active hypothesis set, not a single DTC.

1. Primary hypothesis

Turbo VGT actuator wear

Evidence factors stay visible; the next physical check determines whether this explanation is useful.

2. Review path

Sticking VGT vanes (soot-loading)

Evidence factors stay visible; the next physical check determines whether this explanation is useful.

3. Review path

Wastegate hose leak

Evidence factors stay visible; the next physical check determines whether this explanation is useful.

4. Review path

ECU boost-map drift (calibration)

Evidence factors stay visible; the next physical check determines whether this explanation is useful.

Pilot first

Project the downtime your fleet is leaving on the table.

The same evidence path gives your fleet a defined pilot, a written scope, and the next physical validation step.

Apply for the 30-day pilot